Case Studies

Case Studies: Financial

Transforming Datacentre Cooling

on365 delivered a major datacentre refresh project for a key overseas financial business located in the heart of London. This project not only highlights on365’s technological prowess but also our unwavering commitment to sustainability, legislative compliance and environmental responsibility.

To find out more about the equipment used download the full pdf below:

Download PDF

Transforming Datacentre Cooling

Key Highlights:

A key aspect of the project involved upgrading the original 1st Generation In-Row Cooling System to the cutting-edge 2nd Generation Cooling Platform. This marked a significant achievement for on365 as our first order for this revolutionary technology in the UK.

Central to the upgrade is the adoption of the low Global Warming Potential (GWP) R32 refrigerant, a first for an InRow Cooling product by Schneider Electric. This move aligns seamlessly with stringent environmental regulations and our commitment to ensuring compliance with Fgas phase down legislation ratified in the EU in early 2024.

The new platform boasts a Condensing Unit Design equipped with variable speed compressors, delivering enhanced performance, higher energy efficiency, and better load/low load operation. Furthermore, the implementation of dual power Automatic Transfer Switches (ATS) on both indoor and outdoor units improves resilience by ensuring uninterrupted operation, even in the challenging conditions of a shared building roof.

The new cooling platform transcends conventional boundaries, offering versatility that extends beyond mere retrofit and new build projects. From empowering the establishment of agile Micro Data Centres (MDCs) to facilitating the seamless implementation of Small Row Solutions, this innovative platform heralds a new era of flexibility and scalability for our clients. Its adaptability ensures that regardless of project scope or scale, on365 delivers tailored solutions that align perfectly with our clients’ evolving needs and aspirations.

on365 extends our gratitude to the cooling team at the Conselve Factory for their invaluable support in facilitating early access and ordering of the new offer.

As a testament to our professionalism and expertise, on365 proudly holds accreditations from REFCOM, including FGas, and BESA, enhancing visibility within the mechanical/HVAC industry.

Need more information?
Share the Post:

Other Case Studies

Transforming Datacentre Cooling

Transforming Datacentre Cooling

on365 delivered a major data centre cooling upgrade for an international financial services business based in central London, improving energy efficiency, resilience and environmental performance. The project involved replacing first-generation InRow cooling systems with Schneider Electric’s next-generation cooling platform, incorporating low-GWP R32 refrigerant, variable-speed compressors and dual power automatic transfer switches. As one of the first UK deployments of this technology, the upgrade provides more efficient cooling, improved operational reliability and greater flexibility to support future infrastructure requirements.

Read More
Sustainability & Energy Efficiency Led Datacentre Refresh

Sustainability & Energy Efficiency Led Datacentre Refresh

on365 delivered a major data centre infrastructure refresh for a long-standing client, with a focus on improving energy efficiency, reducing carbon emissions and supporting long-term sustainability goals. The project combined next-generation Schneider Electric chillers using low-GWP refrigerant technology, enhanced free cooling capabilities and a high-efficiency Galaxy VL UPS with lithium-ion batteries. Together with upgraded EcoStruxure™ IT monitoring and reporting, these improvements are designed to reduce energy consumption, strengthen operational resilience and provide greater visibility and control over infrastructure performance.

Read More
MarkerStudy-Case-Study

Markerstudy Insurance Group

on365 worked with Markerstudy Insurance Group to modernise and standardise its data centre and network infrastructure, supporting the company’s rapid growth and evolving operational requirements. Using Schneider Electric EcoStruxure™ solutions, the programme combined resilient power systems, energy-efficient cooling and centralised monitoring to improve reliability, operational efficiency and sustainability. The improvements have enabled Markerstudy to increase computing capacity without increasing power consumption, while simplifying infrastructure management and supporting its long-term carbon reduction objectives.

Read More
Hospital

Modernising Healthcare Data Centres for Clinical-Critical Environments

on365 delivered a turnkey data centre solution for a UK NHS hospital, providing resilient, scalable and energy-efficient infrastructure to support critical clinical and operational systems. The project combined fully redundant power distribution, high-efficiency cooling, thermal containment and integrated monitoring, with resilience and reliability built into the design from the outset. Through end-to-end design, installation and commissioning, on365 delivered a fully integrated solution, rigorously tested to ensure operational reliability and support the hospital’s evolving digital healthcare requirements.

Read More
Loughborough-University-Case-Study-Large

Loughborough University

on365 worked with Loughborough University to modernise its data centre infrastructure, improving resilience, energy efficiency and operational continuity across its campus. Using Schneider Electric EcoStruxure™ solutions, the project combined upgraded power systems, advanced cooling and thermal containment with real-time monitoring and predictive maintenance capabilities. The improvements have strengthened the reliability of critical IT services supporting teaching, research and administration, while providing greater infrastructure visibility, reducing the risk of disruption and supporting the university’s long-term sustainability objectives.

Read More
Transport-Distribution

Modernising Mission-Critical Data Centres in Live, Regulated Environments

on365 worked with a major UK critical infrastructure operator to modernise multiple highly secure, on-premise data centres while maintaining uninterrupted operations. The two-year programme combined advanced monitoring, intelligent power distribution, cybersecurity enhancements and cooling optimisation to improve resilience, efficiency and operational visibility. Delivered through a carefully managed, phased approach, the project demonstrates how ageing, mission-critical infrastructure can be modernised without disrupting essential services.

Read More